| |
Power Transformer, Failure Analysis & Troubleshooting |
Mar |
2024 |
2024/04/01 |
2024/04/05 |
Dubai |
$3,300 |
|
Advanced Structural Geology |
Mar |
2024 |
2024-03-17 |
2024-03-21 |
Dubai |
$4,200 |
|
Advanced Fiber Optics Technology |
Mar |
2024 |
2024-03-03 |
2024-03-07 |
Dubai |
$4,200 |
|
Treatment of Noxious Gases & Solid Wastes |
Mar |
2024 |
2024-03-17 |
2024-03-21 |
Dubai |
$4,200 |
| |
Air Conditioning System Design, Selection, Operation, Maintenance and Troubleshooting |
Mar |
2024 |
2024/03/25 |
2024/03/29 |
Dubai |
$3,300 |
|
Strategy for Industrial Fire: Risk Assessment and Protection of Installations |
Mar |
2024 |
2024-03-17 |
2024-03-21 |
Dubai |
$4,200 |
|
Advanced Casing Design |
Mar |
2024 |
2024-03-24 |
2024-03-28 |
Dubai |
$4,200 |
| |
Machinery Failure, Vibration Analysis And Predictive Maintenance |
Feb |
2024 |
2024/02/12 |
2024/02/16 |
Dubai |
$3,300 |
| |
Total Productivity Maintenance: A Route to World-Class Performance |
Mar |
2024 |
2024/03/25 |
2024/03/29 |
Dubai |
$3,300 |
|
Chemical Spills, Safety Precautions and Response Actions |
Mar |
2024 |
2024-03-03 |
2024-03-07 |
Dubai |
$4,200 |
| |
Management of Predictive Maintenance and Reliability Centered Maintenance |
Mar |
2024 |
2024/03/11 |
2024/03/15 |
Dubai |
$3,300 |
|
Well Stimulation Techniques & Treatments |
Mar |
2024 |
2024-03-31 |
2024-04-04 |
Dubai |
$4,200 |
| |
Valve Actuators & Torque Limiter Troublshooting |
Mar |
2024 |
2024/03/04 |
2024/03/08 |
Dubai |
$3,300 |
| |
Piping System & Pipeline Integrity with an Application of ASME B31 Codes |
Mar |
2024 |
2024/03/11 |
2024/03/15 |
Dubai |
$3,300 |
| |
ARC Flash Hazard Analysis: Impact, Control & Safety |
Mar |
2024 |
2024/03/04 |
2024/03/08 |
Dubai |
$3,300 |
| |
Power Factor Correction and Harmonics |
Mar |
2024 |
2024/03/11 |
2024/03/15 |
Dubai |
$3,300 |
| |
Metallurgy, Corrosion and Prevention of Failures |
Mar |
2024 |
2024/03/11 |
2024/03/15 |
Dubai |
$3,300 |
|
HAZMAT & HAZCOM: Hazardous Materials & Chemicals Safe Handling, Storage, MSDS, Disposal, Monitoring, Response & Spill Clean Up |
Mar |
2024 |
2024-03-24 |
2024-03-28 |
Dubai |
$4,200 |
| |
Instrumentation Diagrams and Symbols Applications |
Mar |
2024 |
2024/03/04 |
2024/03/08 |
Dubai |
$3,300 |
| |
High Pressure Boiler Operation |
Mar |
2024 |
2024/03/11 |
2024/03/15 |
Dubai |
$3,300 |